What this covers
Parts, connections and piping layouts modelled in 2D and 3D before anything is cut, so fit, clearance and routing are settled on the drawing.
Structural integrity and mechanical behaviour validated virtually before production: stress distribution, deformation, vibration, thermal loading and fatigue life simulated to ensure long-term operational reliability.
Advanced simulation of internal and external fluid behaviour: pressure drop analysis, flow coefficient (Cv) calculation, flow velocity, turbulence and thermal distribution modelled to prevent cavitation, leaks and flow restrictions early in design.
A physical prototype built and type tested before bulk production, so a joint is proven leak-free and fit for purpose on the part rather than on paper.
Moving a rail programme from one connector system to another: site visits, design conversion of standard connectors, piping length estimation and special connectors where a standard one will not fit.